Passa alle informazioni sul prodotto
1 su 1

2 Color Retractable Dual Double Pet Leash Rope Walk For Dog Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat

2 Color Retractable Dual Double Pet Leash Rope Walk For Dog Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat

Prezzo di listino $21.99 USD
Prezzo di listino $55.00 USD Prezzo scontato $21.99 USD
In offerta Esaurito
Spese di spedizione calcolate al check-out.
Color
Contact Us (Shipping times vary)
Email: team@luxebymimi.com
We’ll print your text exactly as entered.

 Description:

  • DURABILITY AND SAFETY- This dog training leash is made of sturdy nylon, which is durable and perfectly protects your dog. Chrome-plated hooks enhance 360° rotation at the joint.
  • COMFORTABLE HANDLE-  The ergonomic non-slip handle is easy to grasp and provides a pleasant walking experience for your pet, without worrying that the dog leash will hurt your hand.
  • EASY TO USE- Quick lock, pause and unlock buttons-easy to operate with your thumb. No tangles, it is very suitable for walking, jogging, running, camping and hiking, or going out for a leisurely stroll in the backyard.

Brand Name: STEVVEX Pets
Model Number: ST12DB767QWS

Type: Leashes
Dog Leash Type: Double Leashes
Material: Nylon
Season: All seasons
Pattern: Solid
Feature: LIGHTS

Visualizza dettagli completi